Skip to content

Product support guides

Nuclear Command & Control (NC3) Assurance Check

Moraph software. The NC3 Assurance Check keeps the record of integrity, configuration and link checks on critical command and communication systems: the checks your staff perform under your procedures, or results your own tools send through the Work API, recorded against the baseline your approving authority has signed off. Moraph runs no checks and connects to none of these systems. Every difference or failed test becomes a discrepancy that a person investigates and closes, and unverified is never shown as passing. It runs entirely in your environment, under your authority.

Raise a ticket about Nuclear Command & Control (NC3) Assurance CheckTroubleshooting guide (sign in to read)Product documentation

Critical incident? Raise an S1 ticket: support staff are emailed when you raise it, with the ticket marked critical. Check Moraph Status for incidents already under way.

What Moraph Support handles

  • Workspace configuration help, including record types, fields, stages and allowed moves
  • Check schedule, reminders, sign-off and evidence package problems
  • Work API and integration configuration questions

What goes elsewhere

  • Classified information, which must never be recorded in Moraph Apps or shared with Moraph
  • Running checks on systems, which Moraph Apps doesn't do
  • Investigating and responding to discrepancies, which belongs to your personnel and procedures
  • Fixing differences on the checked systems, which goes through your own change and maintenance processes
  • Authorization decisions and accreditation, which belong to your approving authority

Choosing a severity

SeverityExamples for Nuclear Command & Control (NC3) Assurance Check
S1 Critical
A production service is down or unusable, data may be at risk, or a security incident is under way, and there is no workaround.
  • Nobody can open the workspace
  • A check result shows that it no longer matches its seal
S2 High
A production service is badly degraded or an important function is failing, and the workaround is poor or temporary.
  • Differences found by a recorded check don't open a discrepancy although the setting is on
  • Daily reminders stopped for a whole workspace
S3 Normal
Something is not working as it should, but there is a reasonable workaround or the impact is limited.
  • One page shows an error while others work
  • The discrepancy CSV is missing a column
S4 Low
A question, a minor problem, a request for information or a change that can be planned.
  • How to add a new system type
  • How to structure checklists for a new system family

You choose the severity. Moraph’s support staff are emailed when a ticket is raised, an S1 ticket marked critical, and handle tickets as soon as they can. Moraph doesn’t promise a response or resolution time.

Before you raise a ticket

  1. Check whether one record, one page or the whole workspace is affected
  2. Check the system has an approved baseline and an active checklist that applies to it
  3. Look in Activity for a recent change to settings, stages or allowed moves
  4. Remove any operational or classified details from what you plan to send

What to include in the ticket

  • Record references, such as SYS, CHK, DSC, BASE or CERT followed by the code
  • The page and the time of the problem
  • What you expected and what happened
  • Never credentials, classified information or operational data

Don’t include passwords, secrets or full records of patients, customers or citizens. If we need data like that, we will arrange a secure way to receive it.

Common problems and fixes

A system shows as unverified

Likely cause: Its latest recorded result for a checklist is Unverified.

What to do: Follow up the task raised for that result, perform the check again and record a new result.

A verified integrity check can't be saved

Likely cause: The baseline checked isn't approved, or is for another system type.

What to do: Record the approved baseline of the system's type, or approve a baseline for it first.

A baseline can't be verified or approved

Likely cause: Two-person control blocks the person who prepared or verified it.

What to do: Have someone else verify it, and a product administrator who did neither approve it.

A discrepancy can't be closed

Likely cause: Closure needs Closure proposed and the approval on the record by a product administrator who didn't propose or investigate it; changes after proposing need a new proposal.

What to do: Propose closure again if it changed, and ask another product administrator to approve it.

A certification can't be certified

Likely cause: The readiness list shows what is missing: an approved baseline, a verified current check, or an open discrepancy of blocking severity.

What to do: Resolve the items on the readiness list, or change the readiness rules in Assurance settings if your procedures allow.

A recorded check result is wrong

Likely cause: Results can't be changed after they are recorded.

What to do: Add a comment, or mark it Entered in error and record a new result.

All product support guides · Using Support