Skip to content

Product support guides

Smart Utility Metering & Billing Hub

Moraph software. The Smart Utility Metering & Billing Hub takes register reads from a municipal utility's water and electric meters, loaded by CSV or through the Work API from your head-end exports, checks each one against rules with tolerances you set, and calculates bills under the tiered, seasonal and fixed charges your governing body has approved. When reads are loaded, threshold rules flag possible leaks, stopped meters and tampering, and meters that stop reporting are grouped by area, so staff can act before a customer receives a surprise bill. Every read, estimate, adjustment and bill keeps its history on one account timeline.

Raise a ticket about Smart Utility Metering & Billing HubTroubleshooting guide (sign in to read)Product documentation

Critical incident? Raise an S1 ticket: support staff are emailed when you raise it, with the ticket marked critical. Check Moraph Status for incidents already under way.

What Moraph Support handles

  • Sign-in problems and roles not taking effect
  • Read loads, validation rules, exceptions and the validated usage export not behaving as configured
  • Help configuring Hub settings, record types, fields, stages and choice lists
  • Work API errors
  • Detection flags, bill runs, rate schedules, adjustments and reports not behaving as configured

What goes elsewhere

  • Meters, the meter communication network and head-end systems go to your meter operations team or their vendor
  • Printing and sending bills, ledger posting and payments stay in your billing system, with your print vendor and with your payment processor
  • Rates are set by your governing body
  • Disconnection, collections and customer policy questions go to your utility's management under its own rules

Choosing a severity

SeverityExamples for Smart Utility Metering & Billing Hub
S1 Critical
A production service is down or unusable, data may be at risk, or a security incident is under way, and there is no workaround.
  • Read batches are applied to the wrong meters
  • People can see a product they weren't given access to
S2 High
A production service is badly degraded or an important function is failing, and the workaround is poor or temporary.
  • No batch can be loaded and the billing date is close
  • The validated usage export fails for every cycle
S3 Normal
Something is not working as it should, but there is a reasonable workaround or the impact is limited.
  • One page of the Hub shows an error, but the records can be worked
  • A daily reminder wasn't raised
S4 Low
A question, a minor problem, a request for information or a change that can be planned.
  • How to add a reason code
  • A request for an extra column in the validated usage export

You choose the severity. Moraph’s support staff are emailed when a ticket is raised, an S1 ticket marked critical, and handle tickets as soon as they can. Moraph doesn’t promise a response or resolution time.

Before you raise a ticket

  1. Open the Read batch and check its accepted, exception and rejected counts and the problems listed
  2. Check Hub settings for recent tolerance changes
  3. Look at the meter's reads for meter changes, corrections and estimates
  4. Check the record's Activity for recent changes

What to include in the ticket

  • The record reference or account number, and the billing cycle
  • The meter number and service type if a read is involved
  • What you did, what you expected and what happened
  • The time it happened and your time zone
  • The import or export file name and date, not the file itself
  • Screenshots with customer names, addresses and payment details hidden

Don’t include passwords, secrets or full records of patients, customers or citizens. If we need data like that, we will arrange a secure way to receive it.

Common problems and fixes

A large number of reads were held this cycle

Likely cause: The export was partial or from the wrong date, or a tolerance was changed recently

What to do: Check the batch and Hub settings; cancel exceptions from a wrong export and load the right one.

Lines were rejected with no meter found

Likely cause: The meter number in the export differs from the Meter record, or the meter is Removed

What to do: Correct the meter number on the record or in the export and load the rejected lines again.

High or low use isn't checked for a meter

Likely cause: The meter doesn't yet have enough accepted periods

What to do: The checks start once the meter has the number of accepted periods set in Hub settings.

A meter shows no read in the cycle review although reads were sent

Likely cause: The reads were loaded under a different billing cycle name

What to do: Check the cycle on the Read batch; load the reads again under the right cycle name.

All product support guides · Using Support