Tactical Edge Compute Node Manager
Moraph software. The Tactical Edge Compute Node Manager keeps the record of the Kubernetes clusters running on deployed hardware and of the signed mission software updates and security patches your delivery system moves to them over limited, intermittent links. Each update campaign is approved before rollout, by the mission owner when one is named, goes to pilot nodes first, and is tracked node by node from the check-ins nodes send back: transfer progress, verification, staged, installed or rolled back. Every node's reported configuration, software versions and update history are recorded, so the program can show what is running where. It pushes nothing to nodes itself.
Raise a ticket about Tactical Edge Compute Node ManagerTroubleshooting guide (sign in to read)Product documentation
Critical incident? Raise an S1 ticket: support staff are emailed when you raise it, with the ticket marked critical. Check Moraph Status for incidents already under way.
What Moraph Support handles
- Problems signing in to or using the Tactical Edge Compute Node Manager
- Check-in batches that are rejected or lines left out
- Baseline comparisons, campaign rollout status and automatic hold or completion
- Work API keys, settings and allowed moves
What goes elsewhere
- Delivering, installing or rolling back software on nodes: your delivery system and field teams (the Node Manager pushes nothing to nodes)
- Node agents and the check-ins they send: the agent's owner
- Radios, networks and tactical links: your program's communications team
- Functional or safety defects in mission software: the software's development team
- Authorization decisions and classified network accreditation: your authorizing official and security officer
Choosing a severity
| Severity | Examples for Tactical Edge Compute Node Manager |
|---|---|
| S1 Critical A production service is down or unusable, data may be at risk, or a security incident is under way, and there is no workaround. |
|
| S2 High A production service is badly degraded or an important function is failing, and the workaround is poor or temporary. |
|
| S3 Normal Something is not working as it should, but there is a reasonable workaround or the impact is limited. |
|
| S4 Low A question, a minor problem, a request for information or a change that can be planned. |
|
You choose the severity. Moraph’s support staff are emailed when a ticket is raised, an S1 ticket marked critical, and handle tickets as soon as they can. Moraph doesn’t promise a response or resolution time.
Before you raise a ticket
- Check when the node last checked in and its check-in window
- Open the check-in batch and read the problems listed for lines left out
- Check that the node ID in the check-ins matches the node record
- For campaign status, check the campaign is approved and the node is one of its targets
- For Work API problems, check the key has not expired or been revoked and has the right scopes
What to include in the ticket
- Node, baseline, campaign or batch references, such as CMP-7KQ2PX
- Node identifier and platform type, without classified details
- What you did, what you expected and what happened, with exact error messages
- For Work API problems, the key name, method and path, never the key itself
Don’t include passwords, secrets or full records of patients, customers or citizens. If we need data like that, we will arrange a secure way to receive it.
Common problems and fixes
A check-in line is left out
Likely cause: The node ID, timestamp, versions or campaign status isn't in the expected format, or the node isn't a target of the campaign named.
What to do: Read the problems on the Check-in batch, fix the lines and send them again.
A node shows as not reporting
Likely cause: No check-in has arrived within its check-in window.
What to do: Check with the unit whether the platform is operating and whether its agent or forwarding job is sending check-ins.
A node shows as out of date after an update
Likely cause: The latest check-in that listed versions still shows an older version, or the node's baseline was superseded.
What to do: Wait for a check-in with the new versions, or plan a campaign to the new baseline.
A campaign can't be approved
Likely cause: You created it or changed its plan, a different mission owner is named, the baseline isn't approved, or no node matches the targets.
What to do: Ask the named mission owner or another user, or move the campaign back to Draft and fix the plan.
A rollout moved back to Ready
Likely cause: Failures or rollbacks in the current wave reached the threshold in the settings.
What to do: Review the failed nodes, then move the campaign back to In rollout or cancel it.
A campaign won't complete
Likely cause: Some targets haven't reported the baseline's versions or reported the update installed.
What to do: Check the Nodes table on the campaign for the nodes still to change.
A Work API check-in batch is refused as too long
Likely cause: A batch holds up to 7,999 characters so that no line is cut short.
What to do: Send the check-ins as several smaller batches.
A drift exception opened after an update
Likely cause: The node reported a version that neither its baseline nor an approved campaign it is in lists, or settings that differ from its baseline.
What to do: Check the campaign targets and baseline, then have a product administrator record the decision.
A retired node can't be brought back
Likely cause: Another node now uses its node ID.
What to do: Change one of the node IDs first.